Industry

Process SCADA for Power Plant

Client: One of the India’s largest Power Generation Company    Project Requirements: Plant Parameters to be provided to Central Operational Team @ Delhi for improvement of plant performance/ efficiency Obsolete Hardware is to be removed with latest open hardware With the redundant SCADA functionality, existing Hardware like Chart Recorders, Indicators [...]

Custody Transfer SCADA

Client: One of the India’s largest Petroleum Product Producer Project Requirements: Continuous monitoring of mass flow meter parameters namely mass flow rate, mass flow total, volume flow rate, volume flow total, density & temperature. Batch report generation with details of product name, batch start/stop time, temperature, cumulative mass, cumulative volume [...]

Plant wide SCADA System

Client: One of the India’s largest Steel Producer Company Project Requirements: Monitoring of various sub Plant parameters Online Energy Balance Management Information System Reporting Energy Consumption / Ton of Production Plant Networking Connectivity with other Level 1& 2 System Solution Features, Differentiators & Role of Masibus: Masibus SCADA system takes [...]

Alarm Notification System for Ware Houses/ Cold Storages

Client: One of the India’s largest Drug Manufacturer Project Requirements: Alarm notification whenever temperature rises in Cold storage (SMS & email) Data logging at 2 stages in case of communication failure. Centralized monitoring for all cold storages. Daily data logging file will be sent to pre-defined users via email Dynamic [...]

Sub Station SCADA System

Client: One of the largest integrated power utilities having presence across the value chain of generation, transmission and distribution. Project Requirements: Centralized SCADA Server to capture substation information such as events, measuring parameters as well as remote controlling with highest system reliability and performance. Sub Station Protocol Support – IEC [...]

Fault Recording System

Client: Power Plant in Maharashtra Project Requirements: Disturbance Fault Recording system for Lines When any Line is trips, to find the cause and to fill RCA report i.e. Root Cause Analysis Report. Need information – at what time fault occurred, status of digital channels, status of analog channels etc. Solution [...]

Time Synchronization with redundant GPS System

Client:   500MW Thermal Power Plant in Karnataka Project Requirements: Redundant Master & Slave Clock system for maintaining uniform clock frequency in the SCADA (DCS) system, Protection relays, Electrical switchgear and Display clocks. Solution Features, Differentiators & Role of Masibus: Master Clock system receives the synchronizing pulses from the Global [...]

Time Synchronization GPS System

Client:   IT system in Gujarat and Noida Project Requirements: Time synchronization vide GPS based Master clock at Primary Data Centre (PDC) and Disaster Recovery Centre  (DRC) each to synchronize the respective server landscape time Solution Features, Differentiators & Role of Masibus: 12 Satellite parallel tracking Supports synchronization of IEC61850 [...]

Solar SCADA System

Client: One of the major Solar park EPC/Consultant Project Requirements Requirement complete 15 MW Solar park Scada System Data logging with remote data access and State Load Dispatch Center connectivity Control system suitable for solar park environment for high temperature Control system compatible for different protocols Dashboard for plant monitoring [...]

Wireless Data Monitoring System for Crane Application

Client: One of the India’s largest Aluminum Manufacturing Company Operational Importance: Crane monitoring is a critical operation within a steel or cement plant as multiple cranes separated in different areas, operated individually from the operator’s cabin are used for multiple tasks like removing anode and cathode from the pot, filling [...]