Process SCADA for Power Plant

Client: One of the India’s largest Power Generation Company   

Project Requirements:

  • Plant Parameters to be provided to Central Operational Team @ Delhi for improvement of plant performance/ efficiency
  • Obsolete Hardware is to be removed with latest open hardware
  • With the redundant SCADA functionality, existing Hardware like Chart Recorders, Indicators etc to be removed
  • Plant Parameters connectivity with PI server
  • Management Information System Reporting needs

Solution Features, Differentiators & Role of Masibus:

  • Redundancy at Power Supply, Controller Level & Communication Level
  • Galvanic Isolation for Analog Input
  • Cu53/PT 100 RTD direct input
  • T/C direct Input
  • Isolated 4-20 mA Analog Output
  • Potential Free Binary Contacts with contact Bounce filtering
  • Short Circuit Protected Digital Output
  • Time Synchronization
  • Masibus make Redundant High End Controllers
  • Masibus make Controllers at IO Level
  • Masibus make IO modules
  • Redundant Citect SCADA Server
  • Connectivity to PI server through OPC
  • Connectivity with existing GPS System

Design, Engineering, Manufacturing, Supply, Dismantling of Existing Hardware (Panel), Installation & Commissioning and Training of System on turn-key basis.

Customer Advantages:

  • Removed the Obsolete Hardware
  • Open & Latest System
  • One Analog Input Module for all needs
  • Key Parameter connectivity availability in ERP System
  • Optimum equipment performance in the Plant
  • Accurate Data analysis