104MW Generator Fault Analysis (Gas Power Plant)

104MW Generator Fault Analysis (Gas Power Plant)

Customer Requirement

  • Disturbance fault recording system for 104MW generator fault analysis
  • When any generator is tripped, to find the cause and to fill RCA report i.e. Root cause analysis report
  • Need information – At what time fault occurred, status of digital channels, status of analog channels, Condition of Generator etc.
  • Monitoring of system protection performance
  • Recording of system events
  • The vital evidence that tells what happens during the fault is found in the pre trigger, event duration, and post fault information of the captured record
  • Increases user efficiency when performing RCAs and trip analysis

Systems and Tools

  • Disturbance recorder
  • Configuration & fault analysis software
  • Communication cables & related accessories

Project Scope

  • Supply & commissioning of disturbance recorder with configuration software and communication cables