Central Energy Monitoring System for Steel Plant
Central Energy Monitoring System for Steel Plant

Customer Requirement
- To monitor the generation, consumption and distribution of fuel gases and utility items such as Steam, Oxygen, Nitrogen, Argon, Compressed Air etc. on round-the-clock basis for the plant wide of Integrated steel plant to maintain gas balance suiting dynamic operational demands
 - Maintaining gas distribution based on current allocation and any future allocation requirements
 - Ensuring safety of pipe lines & equipment by generating alarms
 - Periodic usage accounting
 - Management Information System (MIS)
 - Turnkey project includes integration of 25 nos. third party L1 system through existing LAN network, 18 nos. hot redundant PLC system with fully wired panel to integrate utility system
 - IT hardware: Redundant server, database and web servers, 5 nos. remote clients, 5 nos. web clients, printer and 2 nos. 70″ display
 - Fiber optic cabling
 - Redundant UPS system
 
Systems and Tools
- Central redundant SCADA system- 5000 points redundant SCADA, 16 nos. operator clients, 25 nos. web clients, historian, network management software
 - Hardware firewall and OPC gateway to integrate existing third party system
 - IT (Servers, PC, Printer, 70″ displays) & networking hardware
 - 18 nos. Schneider premium PLC with fully wired panel
 - Redundant 15KVA UPS
 - Fiber optic cables with HDPE Pipe
 
Project Scope
- Basic engineering, detail engineering, design, procurement, inspection/FAT, dispatch, material handling (storage & security), supervision, installation, testing, commissioning, performance test, training, as-built documentation and hand-over